翻訳と辞書 |
Barry Power Station : ウィキペディア英語版 | Barry Power Station
Barry Power Station is a 230MWe gas-fired power (station ) on ''Sully Moors Road'' in Sully in the Vale of Glamorgan, Wales. It is eight miles west of Cardiff and is next to a large Ineos Vinyls chemicals works that makes PVC and a Hexion Chemicals plant. ==History== Construction began in January 1997, and it was opened on September 7, 1998, being owned by the AES Corporation, but trading as AES Barry Ltd. Until 2000, it ran as a baseload station. It was bought by Centrica on July 24, 2003 for £39.7m. AES sold the plant because of the low price of electricity at that time. The closure of the plant was proposed in Centrica's accounts in February 2012, but the following month a contract was signed to use it to supply peak power. This required a reconfiguration to allow full load to be reached more quickly, and redundancy for a third of the workforce.〔 It is now run in an open-cycle mode, halving operating costs, with the option of switching to combined-cycle mode after an hour.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Barry Power Station」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|